Ballarat Aquatic Centre

This changeover involved 2 plants, the install of 6 x 150kW Baxi PowerHT boilers in Plant 1, and the install of 5 x 150kW Baxi PowerHT boilers in Plant 2. The boilers are controlled by a RVA47 Sequence Controller linked to an outdoor sensor. The boilers are installed in cascade and modulate from peak power down to 40kW.

Read Less Read More

Project Specifications