HydroHeat Supplies Hydronic System

Commercial Case Studies

Commerical case studies of BAXI PowerHT and BAXI Duo-Tec MP installs, complete commercial hydronic heating system installs.

Phoenix Building Baxi Power HT+ Upgrade

Phoenix Building Baxi Power HT+ Upgrade

The historic Phoenix Building in Ballarat is one of the key building assets of the Ballarat City Council. It required a retro fit boiler install to replace and upgrade the existing conventional type boiler heating system. The change over included ...
Baxi Power HT+ Indoor Cascade Install
/ Commercial Case Studies

Baxi Power HT+ Indoor Cascade Install

A new build hospital required a heating capacity installed to service the medical facility. The new boiler install consisted of 2 x Baxi Power HT+ 150kW models, with a total heating output of 300kW. The Baxi PowerHT+ hi-efficiency condensing type...

Victoria Park Boiler Upgrade

Victoria Park is the former home of the Collingwood Football Club and has been transformed into a major community recreation space. The multi million dollar upgrade includes a community centre and refurbishment of the stands as a first class facil...
/ Commercial Case Studies

Melbourne Polytechnic Preston Campus

The recent renovation of the Melbourne Polytechnic Preston Campus required a heating plant upgrade. New BAXI Power HT+ boilers were chosen to replace the two existing atmospheric boilers to provide a more efficient and cost effective heating syste...
/ Commercial Case Studies

Luxury Residential Apartment Pool Heating

The St Boulevard is a luxury, resort style residential development in Melbourne’s inner south. It comprises 3 residential towers linked by an expansive landscaped garden sanctuary with a vast lagoon pool and spa as well as an indoor spa, sauna and...
/ Commercial Case Studies

Hydronic Radiators for Student Hi-Rise Accom

Over 500 Henrad radiators were used in this new build student accommodation hi-rise in Carlton. To support the expansion of Melbourne’s tertiary institutes and service the growing demand of Melbourne’s overseas student population, a student accomm...
/ Commercial Case Studies

BAXI Duo-tec MP+ for Bendigo Mail Centre

Retro fit install to the Bendigo Mail Centre facility in regional Victoria. The mail centre required new boilers to replace the existing single boiler system, and BAXI Duo-tec MP+ condensing type boilers were chosen to provide heating requirements...
/ Commercial Case Studies

BAXI Boilers Heat DHS Apartment Blocks

The DHS public housing development in Windsor shows the way for clean green design. Known as the K2 Apartments they were constructed in 2006 and consist of 96 modern apartments in four medium rise buildings of four, five and eight stories, designe...

Ballarat Health Services Boiler Upgrade

Ballarat Health Services offer a range of specialist key medical and healthcare services, including acute and sub-acute care, with the Ballarat Hospital facility being the principal referral hospital for the entire Grampians region. The majority o...
/ Commercial Case Studies

Chisholm Institute Frankston Campus

Chisholm Institute’s Frankston Campus in Melbourne’s south required a new boiler to replace the existing unit which had reached end of life. A reliable and energy efficient replacement was critical for providing heat to one of the campus’s major b...

Casselden Office Tower Commercial Heating

Casselden is a modern A-Grade office tower with 39 Levels located in the Parliamentary Precinct in Melbourne. A $50M refurbishment was undertaken with a focus on sustainability and energy efficiency and upgrading the buildings heating system was a...
/ Commercial Case Studies

Ford Swim Centre

The Ford Swim Centre is a new build indoor swim school. It was a dual system installation involving both heating for the pool as well as underfloor heating for the pool deck area. The results provided immediate benefits and energy savings for the ...
/ Commercial Case Studies

Warragul Aquatic Centre

The Warragul Aquatic centre is a brand new purpose built swimming pool complex in the Victorian regional town of Warragul. The project involved an extensive install powered by eight x BAXI Power HT 150kW boilers. The project was installed and comm...
/ Commercial Case Studies

Queen Vic Womens Centre

The Queen Vic Womens Centre undertook a retro fit upgrade from the existing older Boilers installed on the roof of the historic 170 yr old building. The Queen Victoria Women’s Centre is an iconic Melbourne landmark that testifies to the enduring c...
/ Commercial Case Studies

Clarendon College Fitness Centre

New install to brand new secondary school fitness facility in regional Ballarat. Clarendon College is a leading school in the Ballarat area and caters for students from early learning to year 12. The architect designed fitness centre included a 25...

BAXI Power HT Heats Local Swimming Pool

BAXI Power HT boilers were recently installed at a Dandenong Aquatic Centre to provide heating requirements for the commercial pool complex. The condensing technology adapts well to the heating requirements of a commercial swimming pool, maximisin...

Exclusive
Australian
Agents