HydroHeat Supplies Hydronic System



Call: (03) 9588 1299

MLC Building, Sydney

22 April 2009

This installation is an upgrade on the existing system powering the office block occupying 26 floors of the building. The new plant room contains 6 x 150kW Baxi PowerHT boilers controlled by a RVA47 Sequence Controller linked to the Building Management System. The boilers modulate from 900kW down to 40kW.

Download Design Schematic:

System Design Schematic - 4 Power HT Cascade
MLC Building Sydney6
MLC Building Sydney7
MLC Building Sydney1
MLC Building Sydney2
MLC Building Sydney3
MLC Building Sydney4
MLC Building Sydney5

Exclusive
Australian
Agents