Ford Swim Centre

The Ford Swim Centre is a new build indoor swim school. It was a dual system installation involving both heating for the pool as well as underfloor heating for the pool deck area. The results provided immediate benefits and energy savings for the ...
/ Commercial Case Studies

Warragul Aquatic Centre

The Warragul Aquatic centre is a brand new purpose built swimming pool complex in the Victorian regional town of Warragul. The project involved an extensive install powered by eight x BAXI Power HT 150kW boilers. The project was installed and comm...
/ Commercial Case Studies

Queen Vic Womens Centre

The Queen Vic Womens Centre undertook a retro fit upgrade from the existing older Boilers installed on the roof of the historic 170 yr old building. The Queen Victoria Women’s Centre is an iconic Melbourne landmark that testifies to the enduring c...
/ Commercial Case Studies

Clarendon College Fitness Centre

New install to brand new secondary school fitness facility in regional Ballarat. Clarendon College is a leading school in the Ballarat area and caters for students from early learning to year 12. The architect designed fitness centre included a 25...

BAXI Power HT Heats Local Swimming Pool

BAXI Power HT boilers were recently installed at a Dandenong Aquatic Centre to provide heating requirements for the commercial pool complex. The condensing technology adapts well to the heating requirements of a commercial swimming pool, maximisin...

Early Learning Centre LST Radiator Install

A new Early Learning Centre for children in Melbourne’s outer north underwent an installation of low surface temperature radiators. The system is powered by a BAXI Duo-Tec MP60kW, installed externally and flued with a stainless steel flue. 19 r...
/ Commercial Case Studies

Ormond College Melb Uni Power HT Install

Retrofit upgrade to Ormond College at Melbourne University. Components of the original heating system dated back the the 1950’s, with the existing single Natural Gas atmospheric 600kW boiler being replaced by 4 x 150kW BAXI Power HT condensing boi...
/ Commercial Case Studies

Clarendon College Duo-Tec MP Install

Clarendon College Ballarat retrofit upgrade to existing heating boiler installation. The new system consisting of two Duo-Tec MP 110kW boilers is a fully modulating cascade with an integrated seamless flue system penetrating through the roof. The ...
/ Commercial Case Studies

Aged Care Low Surface Temperature Radiators

HydroHeat recently supplied Low Surface Temperature (LST) radiators for an installation to an Aged Care facility in Clarinda Victoria. The facility was a large Aged Care Residence undertaking major refurbishment and new build including complete he...
/ Commercial Case Studies

Pitt Street Sydney Retro Fit Boiler Upgrade

Located opposite Pitt Street Mall in Sydney’s CBD this A Grade 22 level office tower was completely refurbished with state of the art systems and finishes used throughout. BAXI Power HT boilers were chosen to replace the existing heating system an...
/ Commercial Case Studies

Melbourne Treasury Buildings

Victorian government goes with BAXI! After the successful rollout of Baxi boilers into the Old Treasury Building, the remainder of Melbourne’s Treasury buildings are now heated by Baxi Power HT boilers. The changeover from the old system to the ne...
/ Commercial Case Studies

Mort St Canberra Office Building Retrofit

Retrofit upgrade to a 45 year old Government office building of over 5,400m2. The existing electric heating system was removed and replaced with high efficiency BAXI gas fired boilers which played a key part in reducing the buildings carbon footpr...

University of Launceston

The University of Launceston is now heated by Baxi PowerHT boilers installed with a RVA47 Sequence Controller and run by the Building Management System. This system has been designed to operate at maximum efficiency with underfloor heating and ove...
/ Commercial Case Studies

Monash University (Caulfield Campus)

The install of Monash University’s new heating system consisting of three Baxi 150 kW PowerHT boilers in cascade went ahead without a hitch. The plant is installed with a RVA47 Sequence Controller linked to the Building Management System. Downloa...
/ Commercial Case Studies

450 kW Upgrade at University of Ballarat

This new plant at the University of Ballarat Student Accommodation building is providing domestic hot water and heating to the 35 year old building. The 3 x 150 kW Power HT and an RVA 47 cascade sequence controller controls the new system. An outd...

1500kW BAXI System in Hobart

HydroHeat Supplies now have 2 large plants commissioned in Tasmania. The smaller tower in a commercial complex at 188 Collins St Hobart has a 600kW plant comprised of 4 x Baxi 150kW PowerHT boilers while the larger tower has a 900kW plant comprise...