45 kW Baxi Luna HT, Loreto College Chapel Ballarat

Loreto College chapel has been cold in winter for 130 years. Now thanks to a new hydronic heating system installed by Paul Turner Plumbing of Ballarat, church services at the chapel will never be cold again. The chapel is Heritage listed so minim...
/ Commercial Case Studies

McClelland Gallery Langwarrin

Boiler installation to the McClelland Gallery of 2 x 85kW BAXI PowerHT boilers in cascade controlled by a RVA47 Sequence Controller linked to the existing Building Management System. The boilers are driven and the delivery temperatures are set by ...
/ Commercial Case Studies

Latrobe University (Shepparton)

Installation to Latrobe Uni (Shepparton) plant room of 3 x 100kW BAXI LunaHT wall mounted boilers in cascade controlled by a RVA47 Sequence Controller linked to the Building Management System. Given the very tight plant room, pipe manifold kits we...

Mooroolbark Aged Care Facility

This changeover, performed by GMR Mechanical is comprised of a heating as well as domestic hot water system. The heating plant consists of 3 x 120kW Baxi PowerHT boilers in cascade controlled by a RVA47 Sequence Controller while the domestic hot ...
/ Commercial Case Studies

Melbourne Old Treasury Building

Melbourne’s Old Treasury Building, built in the mid-19th century, had a boiler upgrade carried out by A.G. Coombs. The new system is comprised of 2 x 150kW Baxi PowerHT boilers controlled by a RVA47 Sequence Controller. The flue manifold system is...
/ Commercial Case Studies

MLC Building, Sydney

This installation is an upgrade on the existing system powering the office block occupying 26 floors of the building. The new plant room contains 6 x 150kW Baxi PowerHT boilers controlled by a RVA47 Sequence Controller linked to the Building Manag...
/ Commercial Case Studies

Ballarat Aquatic Centre

This changeover involved 2 plants, the install of 6 x 150kW Baxi PowerHT boilers in Plant 1, and the install of 5 x 150kW Baxi PowerHT boilers in Plant 2. The boilers are controlled by a RVA47 Sequence Controller linked to an outdoor sensor. The ...
/ Commercial Case Studies

Mansfield Hospital

This installation is an upgrade on the existing system powering the office block occupying 26 floors of the building. The new plant room contains 6 x 150kW Baxi PowerHT boilers controlled by a RVA47 Sequence Controller linked to the Building Manag...