McClelland Gallery Langwarrin

Boiler installation to the McClelland Gallery of 2 x 85kW BAXI PowerHT boilers in cascade controlled by a RVA47 Sequence Controller linked to the existing Building Management System. The boilers are driven and the delivery temperatures are set by the 0-10 volt control.

Download Design Schematic:

System Design Schematic - 4 Power HT Cascade

Read Less Read More

Project Specifications