HydroHeat Hydronic Heating Project Case Studies showing Residential and Commercial installations, including wall radiators, colour coated rads, floor heating and BAXI hydronic heating boilers.
/ Commercial Case Studies

Melbourne Treasury Buildings

Victorian government goes with BAXI! After the successful rollout of Baxi boilers into the Old Treasury Building, the remainder of Melbourne’s Treasury buildings are now heated by Baxi Power HT boilers. The changeover from the old system to the ne...
/ Commercial Case Studies

Mort St Canberra Office Building Retrofit

Retrofit upgrade to a 45 year old Government office building of over 5,400m2. The existing electric heating system was removed and replaced with high efficiency BAXI gas fired boilers which played a key part in reducing the buildings carbon footpr...

University of Launceston

The University of Launceston is now heated by Baxi PowerHT boilers installed with a RVA47 Sequence Controller and run by the Building Management System. This system has been designed to operate at maximum efficiency with underfloor heating and ove...
/ Commercial Case Studies

Monash University (Caulfield Campus)

The install of Monash University’s new heating system consisting of three Baxi 150 kW PowerHT boilers in cascade went ahead without a hitch. The plant is installed with a RVA47 Sequence Controller linked to the Building Management System. Downloa...
/ Commercial Case Studies

450 kW Upgrade at University of Ballarat

This new plant at the University of Ballarat Student Accommodation building is providing domestic hot water and heating to the 35 year old building. The 3 x 150 kW Power HT and an RVA 47 cascade sequence controller controls the new system. An outd...

1500kW BAXI System in Hobart

HydroHeat Supplies now have 2 large plants commissioned in Tasmania. The smaller tower in a commercial complex at 188 Collins St Hobart has a 600kW plant comprised of 4 x Baxi 150kW PowerHT boilers while the larger tower has a 900kW plant comprise...
/ Commercial Case Studies

45 kW Baxi Luna HT, Loreto College Chapel Ballarat

Loreto College chapel has been cold in winter for 130 years. Now thanks to a new hydronic heating system installed by Paul Turner Plumbing of Ballarat, church services at the chapel will never be cold again. The chapel is Heritage listed so minim...
/ Commercial Case Studies

McClelland Gallery Langwarrin

Boiler installation to the McClelland Gallery of 2 x 85kW BAXI PowerHT boilers in cascade controlled by a RVA47 Sequence Controller linked to the existing Building Management System. The boilers are driven and the delivery temperatures are set by ...
/ Commercial Case Studies

Latrobe University (Shepparton)

Installation to Latrobe Uni (Shepparton) plant room of 3 x 100kW BAXI LunaHT wall mounted boilers in cascade controlled by a RVA47 Sequence Controller linked to the Building Management System. Given the very tight plant room, pipe manifold kits we...

Mooroolbark Aged Care Facility

This changeover, performed by GMR Mechanical is comprised of a heating as well as domestic hot water system. The heating plant consists of 3 x 120kW Baxi PowerHT boilers in cascade controlled by a RVA47 Sequence Controller while the domestic hot ...
/ Commercial Case Studies

Melbourne Old Treasury Building

Melbourne’s Old Treasury Building, built in the mid-19th century, had a boiler upgrade carried out by A.G. Coombs. The new system is comprised of 2 x 150kW Baxi PowerHT boilers controlled by a RVA47 Sequence Controller. The flue manifold system is...
/ Commercial Case Studies

MLC Building, Sydney

This installation is an upgrade on the existing system powering the office block occupying 26 floors of the building. The new plant room contains 6 x 150kW Baxi PowerHT boilers controlled by a RVA47 Sequence Controller linked to the Building Manag...
/ Commercial Case Studies

Ballarat Aquatic Centre

This changeover involved 2 plants, the install of 6 x 150kW Baxi PowerHT boilers in Plant 1, and the install of 5 x 150kW Baxi PowerHT boilers in Plant 2. The boilers are controlled by a RVA47 Sequence Controller linked to an outdoor sensor. The ...
/ Commercial Case Studies

Mansfield Hospital

This installation is an upgrade on the existing system powering the office block occupying 26 floors of the building. The new plant room contains 6 x 150kW Baxi PowerHT boilers controlled by a RVA47 Sequence Controller linked to the Building Manag...